Corporate Peer Challenge Report 2018
Corporate Peer Challenge Report 2018
-
Harborough Corporate Peer Challenge Report (PDF, 450.3 KB)
Latest updates
Flooding drop-in event (Great Glen), Regulation 19 consultation on draft local plan, Temporary closure of some EV Charging Points for upgrades, Lutterworth Car Park Closure.
Find out moreCorporate Peer Challenge Report 2018